Jeremy Heilman's BIM/IPD Thesis Reflection

 

Being apart of HPR Integrated Design for the 2011/2012 senior BIM/IPD thesis program has not only been fulfilling, but a great learning tool for my future career. As the construction industry moves forward, many new technologies are being created to enhance the design and construction experience.

As a team, each member takes a share in the profit or the consequences. This project, when given to us, was not in complete design. The HPR designers and construction manager had to work together to ensure the completed design was within code, within budget, completed on-time, and headed towards achieving a LEED Gold certification.

Working together as a team allowed us to be more involved in developing the alternative design packages. Bringing a team together for each design aspect created an opportunity for good communication in each design aspect. Utilizing 3D coordination helped to reduce and minimize any rework and redesigns, much like in the industry. In the process of design, constructability and sequencing were always in mind. Our main goals were to deliver a higher quality product for the budget allotted while improving the schedule. HPR's designs were initially over budget, but with the construction manager as member of the BIM Team, HPR was able to improve the schedule by 17 workdays, resulting in a constructive design that came in under budget.

In the end, HPR found more benefits than struggles while working as a BIM Team. Through collaboration and communication, HPR was able create a successful project.

I would like to take this time to thank Mortenson Construction, PJ Dick, and DPR Construction for the information and help that they provided for the construction manager support, and all the contacts made through each of the HPR designers for their help and support in making this a successful project. I'd also like to thank the professors and advisors of HPR. Finally, I'd like to thank the HPR team, as well as their friends and family for their support.

ABET Outcome Survey

 

Dates

Updates

















4/30/2012

4/30/2012
4/25/2012




4/23/2012

4/23/2012
4/23/2012

3/12/2012

2/23/2012

1/13/2012

12/12/2011

12/10/2011

11/28/2011
11/16/2011

11/9/2011
10/9/2011

9/9/2011




9/7/2011

9/7/2011
9/2/2011

CPEP Website Ready For Review
Abstract Posted
Reflection Posted
Jeremy Heilman - CM
Joshua Progar - S
Nico Pugliese - L/E
James Rodgers - M
Final Presentation Posted (*.PDF)
Final Report Posted
Executive Summary
Posted

Proposal Report
Revision 2 Posted

Go-No-Go
Presentation Posted

Proposal Report
Revision 1 Posted

Proposal Report
Posted

Proposal Presentation
Posted

Building Stats Posted

Design Development Presentation Posted

BIM Ex Plan Posted
Schematic Design
Presentation Posted

Student Bios Posted
Jeremy Heilman - CM
Joshua Progar - S
Nico Pugliese - L/E
James Rodgers - M
Research Presentation
Posted

Research posted
Website Live

       
The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here.
 

Senior Thesis

The Pennsylvania State University

Architectural Engineering

AE Computer Lab

Contact

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of this BIM/IPD group. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
This site last updated by HPR Integrated Design on Monday, April 30, 2012 10:33 AM and is hosted by the AE department ©2011